Blog · A home network run like a small office

Keeping a non-developer in charge

Too many setup guides, too much testing on my plate, and the family going last.

In this series · Chapter 9, How the work got doneShow all 49 partsHide the list

1. Where it started

  1. 01Why I'm running my home like a small office
  2. 02What a read-only audit of my network found
  3. 03The first changes, and the ones I said no to
  4. 04Reuse first, build only what's missing
  5. 05Fifteen decisions before the first line of code

2. Remote access and keys

  1. 06One way in from outside
  2. 07An address that keeps itself up to date
  3. 08Where the passwords live
  4. 09Keys that can do one thing

3. Monitoring

  1. 10Is it my network or the internet provider?
  2. 11A watcher outside the house, and backups I've restored
  3. 12The drill that found the bug
  4. 13Alerts that only reach my phone when something needs me
  5. 14I had the monitor audit itself
  6. 15Teaching the hub to stop crying wolf

4. The network redesign

  1. 16"Don't take down my internet": the routine before every change
  2. 17The firewall upgrade, two days late
  3. 18Keeping the plan when the builder wanted to drop it
  4. 19Two Wi-Fi drops, and knowing when to stop
  5. 20The router at 90 percent
  6. 21Moving 40 gadgets without touching each one

5. The media server

  1. 22Bringing the media server back, and keeping it up
  2. 23The movie that stuttered on one TV

6. The control center

  1. 24An overnight prototype, and bars instead of dials
  2. 25A nice hub, tucked away in a drawer
  3. 26Instructions for a phone I don't own
  4. 27Three checks before anything goes live
  5. 28Buttons with a seatbelt
  6. 29Rewind: replaying a Wi-Fi outage
  7. 30"I just want a more sensible layout"

7. Security

  1. 31A security scoreboard that started at a D
  2. 32Who's knocking: a security tab in two evenings
  3. 33Matching every program to the public flaw lists
  4. 34A DNS log for the house
  5. 35A weekly scan that can't annoy anyone
  6. 36The week of the scary flaw list

8. A private AI assistant

  1. 37A private AI for the house that can't touch anything

9. How the work got done

  1. 38Keeping a non-developer in charge
  2. 39A house manual that rebuilds itself every night
  3. 40My AI assistant keeps blocking itself, and I'm glad
  4. 41What it cost, what's next, and what I'd bring to an office

10. After the rebuild

  1. 42The backup that filled its own disk
  2. 43Two messages, one second, wrong order
  3. 44My help tool said "fine" at 7 megabits

11. Groceries

  1. 45Reading our grocery orders until the store locked us out
  2. 46I was testing a cart button when I found out nobody wanted one
  3. 47My first grocery rule would have nearly doubled what we buy
  4. 48The third store was the cheapest on nothing
  5. 49The house AI's only grocery job is picking a picture

I don't write code. I ran this project the way I've run software teams: deciding what to build, in what order, and when it was good enough. Working with an AI coding assistant, that role needed protecting more than I expected. A few moments show how.

"So many setup guides"

Early on, the assistant gave me a setup and test guide with 3 steps and 12 tests, about 45 minutes of work. Then another. Then another. A few days later, I told it I had no idea what step five of the setup guide was. "So many setup guides."

The fix was one table in plain language. Every cryptic session label got a sentence explaining what it was and whether it needed me. Labels and codes are fine for the builder. The owner needs sentences.

A project map I can edit

I asked for dates next to every session and for the future sessions to show my timeline. The project map became a private page I can edit, with projected finish dates. When I change it, the next session reads my changes instead of asking me to retype them.

The family goes last

On October 12, I noticed the plan had the family being added before the work was finished. I wrote: "I still don't understand why we're going to add the family before finishing the thing. Adding everybody should be the absolute last thing we do."

Within the hour, the plan had a new final stage, family rollout, after everything else. Bringing people onto something half-built spends their patience, and you only get so much of it.

"You go figure this out"

By October 15, I was spending too much time testing. I said so, bluntly: I was doing too much testing, I wanted the assistant to figure it out, and I wanted it done in a couple of days. I also said I do very much care about the back end and wanted it done right.

The plan changed. The assistant does the testing. Helpers work in parallel. Only steps that truly need me, like clicking something it can't, or saying go live, reach me. A few days later, it admitted that earlier sessions had been handing me their own housekeeping. That stopped.

Aligning with my own rules

I keep a set of working rules that apply to all my projects. On October 18, I asked the assistant to align this project with them: back up first, find anything that repeats or conflicts with my rules, and show me a before-and-after page before changing anything. It found 9 conflicts and 7 repeats, among other things. I approved its suggestions, and three outdated notes were removed.

Whoever's building for you, a person, a firm, or an AI, your time is the thing to protect. For me that meant plain-language status, one page for the plan that I can edit, testing done by the builder, and the family last, when the thing works.

Have something in mind?

Tell me what you're trying to do. I reply within two business days.

Get in touch