Blog · Setting up Claude Code to work my way

Every project starts with the same five files

A rules file, a map with a three-line desk card, a diagram, a history log, and Git.

In this seriesShow all 11 partsHide the list
  1. 01One file every session reads first
  2. 02Where it writes things down, and where it doesn't
  3. 03Every project starts with the same five files
  4. 04What it does on its own, and what waits for me
  5. 05Show me before you build it
  6. 06A front desk for all my projects
  7. 07The cheapest model that does the job right
  8. 08Two voices: documentation and me
  9. 09Rules that came from things going wrong
  10. 10Keeping projects from bleeding into each other
  11. 11Routines that get better every run

I run a lot of projects with Claude Code, and every one of them starts with the same five things. A helper skill sets them up, so no project starts without them.

The five

  1. A rules file for the project. What it is, the commands that check and build it, and its own rules. It adds to my main rules file and overrides it where they disagree.
  2. A project map. Where the work stands, what's next, and what's waiting on me.
  3. An architecture diagram. The pieces and how they connect, updated whenever they change.
  4. A history log. What changed and why, newest first.
  5. Git, with a private copy on GitHub. Everything above is versioned and backed up off the PC.

The desk card

The top of every project map is three lines, always in the same shape:

  • Resume: the batch number, a short label, and the next step.
  • Waiting on you: anything that needs me, or "Nothing."
  • Updated: the date.

That top section loads on its own when a session starts, so the session knows where things stand before I type a word. When I come back to a project after two weeks, I read those three lines and I know too.

Work in numbered batches

Work is planned in batches, and every batch gets a number and a short label, like "Batch 12: contact form." I asked to never see a number alone. "Batch 12" means nothing to me a month later. "Batch 12: contact form" does.

The wrap-up

When I say "wrap up," the session updates the map and its desk card, adds to the history log, and saves anything new to memory. Then it gives me three things: what I can look at now, my next steps, and the exact line to start the next session with.

That last one is my favorite. I paste it into a fresh session, and the work picks up where it stopped, with no recap and no "where were we." Most of what makes these projects hold together over weeks is that one handoff line.

Have something in mind?

Tell me what you're trying to do. I reply within two business days.

Get in touch